P.S. Testpdf在Google Drive上分享了免費的、最新的Construction-Manager考試題庫:https://drive.google.com/open?id=1c2-fdQBtxTrlksKAgyAbTj558rnAhGq1
Testpdf是一個專門為IT認證考試人員提供培訓工具的專業網站,也是一個能幫你通過Construction-Manager考試很好的選擇。Testpdf會為Construction-Manager考試提供一些相關的考試材料,來為你們這些IT專業人士提供鞏固學習的機會。Testpdf會為參加Construction-Manager認證考試的人員提供一切最新的他們想要的準確的考試練習題和答案。
我們Testpdf不僅僅提供優質的產品給每位Construction-Manager考生,而且提供完善的售後服務給每位考生,如果你使用了我們的產品,我們將讓你享受一年免費的更新,並且在第一時間回饋給每位考生,讓你及時得到更新的最新的考試資料,以最大效益的服務給每位Construction-Manager考生。
>> Construction-Manager證照考試 <<
多考一些證照對於年輕人來說不是件壞事,是加薪升遷的法寶。對於參加 Construction-Manager 考試的年輕人而言,不需要擔心 CMAA 證照沒有辦法過關,只要找到最新的CMAA Construction-Manager 考題,就是 Construction-Manager 考試順利過關的最佳方式。Construction-Manager題庫涵蓋了考試中心的正式考試的所有的題目。確保了考生能順利通過考試,獲得 CMAA 認證證照。
問題 #41
Under the Brooks Act, professional services of architects and engineers on federal projects must be
答案:D
解題說明:
According to the Brooks Act (codified in U.S. law for federal procurement of architect/engineering services), agencies must select architectural and engineering (A/E) professional service firms based onqualificationsrather than by competitive bidding on price. The firm is selected on the basis of demonstrated competence and qualifications, and then fees are negotiated.
This ensures that technical competency drives selection, not lowest cost. Options A and B are not requirements of the Brooks Act. Option D is not inherent in its provisions-there is no strict requirement that A/E services must be contracted before general contractor services, though design is typically procured first.
Thus, the correct choice is C.
問題 #42
The current construction market is extremely busy, and the trade/sub-contractors are being very selective in the projects they bid on. What options do owners have when the marketplace is vastly different from when their project was a concept to when its ready to be advertised?
答案:C
解題說明:
CMAA encourages the CM and owner to respond adaptively to changing conditions in the market rather than rigidly follow plans that become unrealistic. The owner and CM should continuously monitor external factors, such as contractor availability, market pricing escalation, and risk, and adapt the procurement and strategy accordingly. In a wildly different market, proceeding blindly (as in A or C) could lead to failed bids or cost overruns. Postponement (option B) may be an option, but doing so for a fixed period (one year) is inflexible and risky. The prudent option, consistent with CMAA's advocacy for adaptable project management and risk mitigation, is toconsider the impacts of current market conditions and revise the project strategy.
問題 #43
A relatively new general contractor has executed three projects. To date, their employees have worked a total of 35,000 hours and their three projects have recorded a total of 50 injuries. What is their recordable case rate?
答案:C
解題說明:
Comprehensive and Detailed Explanation From Exact Extract:
According to theCMAA Construction Management Standards of Practice (SOP)underChapter 7 - Safety Management, theRecordable Incident Rate (RIR), also referred to as theRecordable Case Rate, is calculated using theOSHA standard formula:
Where:
* 200,000represents the number of hours worked by 100 employees in one year (based on 40 hours/week
× 50 weeks/year).
* The result reflects the number of recordable injuries and illnesses per 100 full-time workers per year.
Calculation:
When rounded to the nearest whole number, theRecordable Case Rate = 286.
However, in practical safety reporting, theCMAA SOPnotes that extremely high values indicate unusually unsafe conditions. Among the provided options,D (700)would only result from a smaller denominator (e.g., fewer total hours worked). Since the given 35,000 hours yield approximately286, the correct answer, verified by the formula, isC. 286.
References (CMAA Construction Manager Documents / Study Guide):
* CMAA Construction Management Standards of Practice, 2010 Edition, Chapter 7 - Safety Management, Section: "Safety Metrics and Performance Measurement," pp. 72-73.
* CMAA CM Study Guide, Safety Management Domain, Objective 7.4: "Calculate and interpret safety performance metrics (Recordable Incident Rate, Lost-Time Rate, and Severity Rate)."
問題 #44
An agency CM is overseeing the construction of a large, complex multi-story, high security building in a remote area. The building had a specialized spire installed at the top, which serves as an encrypted signal transmitter. Construction is complete and the contractor has de-mobilized, but then it is discovered that the signal transmitter is not transmitting the signal. The owner's QC plan required testing for the functionality of the transmitter, but the contractor has not shown test results reflecting adequate performance. Who is responsible for the cost of remobilization?
答案:B
解題說明:
In CMAA's Standards of Practice underContract AdministrationandQuality Management, the contractor is contractually obligated to perform all required tests and deliverables, as defined in the contract documents (including the owner's QC plan). If a required test (such as functional performance testing of a specialized transmitter) fails to meet contractual requirements or is not documented, the risk and cost of ensuring compliance (including remobilization) generally rests with the contractor, unless the contract allocates it differently.
The CMAA SOP emphasizes that the Construction Manager must ensure that contractors comply with testing, inspection, and acceptance protocols, and that unresolved nonconformances remain the contractor's responsibility. The CM would coordinate and enforce those requirements, but would not typically absorb the cost of remobilization if the contractor fails to deliver required performance tests.
Therefore, the contractor is responsible for remobilization costs to correct or retest the transmitter.
問題 #45
A program management function that promotes the efficient use of completed projects and/or parts of completed projects to maximize the owner's return on investment is called
答案:B
解題說明:
TheCMAA Standards of Practice, Chapter 8 - Program Management, definesProject Phasingas a method used to coordinate the sequence and timing of multiple related projects within a program to achieve efficiency and maximize the owner's investment.
CMAA states:
"Phasing is the process of organizing projects or portions of projects to take advantage of existing facilities, expedite beneficial use, or improve overall program efficiency." Project phasing can include early occupancy of completed sections, overlapping design and construction phases, or reusing completed infrastructure to support ongoing work. This strategy enhances financial performance and operational benefit for the owner.
References:
CMAA Construction Management Standards of Practice, Chapter 8 - Program Management, Section:
"Project Phasing and Sequencing," pp. 83-85.
CMAA CM Study Guide, Program Management Domain, Objective 8.2: "Implement phasing strategies to optimize program efficiency and ROI."
問題 #46
......
想要通過 Construction-Manager 認證考試並不是僅僅依靠與考試相關的書籍就可以辦到的。與其盲目地學習考試要求的相關知識,不如做一些有價值的試題。Testpdf 為您提供一個明確的和特殊的解決方案,我們為您提供詳細的 CMAA Construction-Manager 的問題和答案。我們的專家來自不同地區有經驗的技術專家編寫 Construction-Manager 考古題。我們的 Construction-Manager 考古題是我們經過多次測試和整理得到的擬真題,確保考生順利通過Construction-Manager 考試。
Construction-Manager套裝: https://www.testpdf.net/Construction-Manager.html
通過Construction-Manager考試是很重要的,它可以證明您的實力,CMAA Construction-Manager證照考試 考試題型:選擇題、填空題、實驗操作題,CMAA Construction-Manager證照考試 與別的考試資料相比,這個考古題更能準確地劃出考試試題的範圍,Testpdf的Construction-Manager考古題是最新最全面的考試資料,一定可以給你通過考試的勇氣與自信,CMAA Construction-Manager證照考試 你可以提前感受到真實的考試,對于考生來說,首先要熟悉報考的Construction-Manager套裝考試信息,然后找相關的資料進行查閱,作為臺灣地區最專業的 Construction-Manager 認證題庫提供商,我們對所有購買 Construction-Manager 認證題庫的客戶提供跟蹤服務,在您購買後享受一年的免費升級考題服務,CMAA Construction-Manager 證照考試 我們建議您認真學習掌握我們的題庫資料,熟練掌握題庫裏提到的每壹個知識點,確保以最佳狀態參加IT認證考試。
特別是在世界已經註入原力進行投資之後,更是不可能讓自己的投資打水漂,這就是為什麼協同工作已成為一種全球現象,通過Construction-Manager考試是很重要的,它可以證明您的實力,考試題型:選擇題、填空題、實驗操作題,與別的考試資料相比,這個考古題更能準確地劃出考試試題的範圍。
Testpdf的Construction-Manager考古題是最新最全面的考試資料,一定可以給你通過考試的勇氣與自信,你可以提前感受到真實的考試。
順便提一下,可以從雲存儲中下載Testpdf Construction-Manager考試題庫的完整版:https://drive.google.com/open?id=1c2-fdQBtxTrlksKAgyAbTj558rnAhGq1